To describe how the function of the system that is distributed in every node. It only takes on a distributed system.
Distribution processes in two or more nodes require closer observation of the pattern of inter-process communication within the system. To benefit more distribution requires work and careful planning.

Step - step Describe Distribution

1. Determining Network Configuration
To understand the configuration and network topology.
Capabilities and characteristics proseccor and devices as well as on a network topology will determine the nature and degree of likelihood in the distribution system.

Things to note:
1. The network topology (layout of the device), as well as its location.
2. Node node on the network, its configuration and capabilities. Configurations including hardware and software installed in each of nodes, number of processors, storage capacity, memory, swap, etc.
3. Bandwitdth
4. The existence of redundant networks.
5. Functionality on each node. Including:
6. Workstations used by the end user.
7. Server for each prosses happened. To simplify the configuration of the server, the server components are made "headless", in which there is no user interface.
8. Special configuration for development and testing.
9. Other specialized processors.
10. IP Design and trimmings (DNS, VPN, etc.).

The following diagram illustrates the Deployment View for the ATM machine.

The diagram illustrates two nodes, namely ATM and ATM Network Server which all connections between banks occurs.

2. Allocation process to the node.
To distribute the workload system.
The process should be allocated to the node so meninimalisir amount of traffic between networks.

Which must be considered:
1. Capacity Node.
2. Communication Media Bandwidth (bus).
3. Availability of hardware and communication links.
4. Redundancy and fault tolerance.
5. Time respone
"Good Quality" Requirements are the main factors the success of a software development project that make products with "good quality". The products with the features of the initial pre-determined and functional, timely and budget estimates. ABB has adopted the software development process based RUP®1 a project to develop a new generation Stressometer system.

"Good Quality" Software Requirements are requirements for software product"Qualified".
Cost "Bad Quality" Requirements have been studied since the early 1970s. Research Boehm to 63 software project of the three companies, namely GTE, TRW, and IBM, described that the changes in the cost grows exponentially during the project. These results suggest that the repair cost two hundred times greater than the maintenance phase stage requirements.

RUP is a generic process and can not be avoided in accordance with the needs of a specific project or projects of special department for an efficiency and effectiveness better. In an effort to establish a balance between providing good quality software products and so timely, Stressometer ABB product lines adapted RUP while adhering to the RUP.